What the Masons Do

A remodel on our crew starts behind the face. We check that the firebox and flue are sound, because a new surround over a cracked back wall only hides the problem. Then we build the new face: reclaimed brick, cut stone, tile or a plaster finish, a raised or flush hearth, and a mantel set at the clearance the opening needs. Converting to a gas insert can be planned in the same job.

Firebox and flue looked over before demolition
Reclaimed brick or cut stone laid as a new face
Raised or flush hearth to suit the room
Mantel placed at the clearance the opening needs
Gas insert planned into the same layout

Masonry Behind the Finish

A remodel usually begins with how the fireplace looks: a dated brick face, a cracked tile surround, a hearth that does not suit the room. The finish is the last layer, though, and it has to sit on sound masonry. Before any design is fixed, we look at the firebox, the brick or block behind the face, the lintel over the opening and the hearth slab. A firebox with burnt-out joints or a rusting lintel should be repaired before a new face goes over it, because tearing out stone later to reach a problem costs far more. We also measure the clearances: how far wood mantels and trim sit from the opening and how deep the hearth runs into the room. Older houses sometimes have a mantel too close for the heat of an open fire. A remodel is the moment to put that right, so the room ends up safer as well as better looking.

Most of the materials we use are masonry. Thin brick or full brick for a traditional face. Natural or manufactured stone veneer, laid on a scratch coat over the existing brick with the joints dressed to suit the stone. Tile and stone slab set in mortar with a heat-rated adhesive. Hearths in stone, brick or poured concrete. Smooth plaster or limewash over brick for a plainer look, where the brick underneath is sound and breathable coatings are used. We also fit the steel and stone details that need a mason's hand, such as a new lintel, a raised hearth or a stone mantel shelf. Wood mantels are set at the right height and distance for the fire, and fixed into the masonry behind. Each part of the remodel is priced on its own line so you can choose finishes with the cost of each in view.

Changing How the Fireplace Burns

Many remodels in Yorba Linda also change the fire. A family that rarely burns wood may want a gas log set, a sealed gas insert or a new gas fireplace in place of the old one. Each choice changes the remodel. Gas logs keep the open firebox, so the face and clearances stay much as they are. An insert fits into the firebox and needs a liner up the flue, and the face is built around its trim. Taking out the old fireplace for a new gas unit changes the size and shape of the opening and may change the hearth requirement. We plan the masonry around whichever one you choose, and the inserts and gas logs pages show what each costs. Expect $2,850 to $5,750 installed when a gas insert goes into existing brick, and $4,600 to $9,200 when a sealed gas unit is framed into a wall that never had a fireplace.

A remodel visit starts with a conversation about how the room is used and what look you have in mind, then a measure of the fireplace, the wall and the space in front. We will tell you which ideas suit the masonry you have and which would need structural changes. The written quote lists the demolition, the masonry repairs found underneath, the new face, hearth and mantel, any insert or gas work, and the materials named, with a price on each. Some finishes, like natural stone, have lead times, and we will tell you before the job is booked. Dust is kept down with sheeting and a filtered vacuum, and the room is left clean. To start, send the contact form with a few words on the fireplace and the change you want. We work across Yorba Linda, Anaheim, Fullerton and Tustin.

The Way Wolsey Chimney Solutions Works

Brick Read First

Joints and crown looked at before any tool comes out

Matched Mortar

A mix chosen for the age and hardness of the brick

Figures in Writing

Each line priced on paper before work begins

Photos of Defects

Each finding shown where it sits on the stack

More of Our Trade Work

Chimney Sweep

Creosote scraped off the clay tile, the smoke shelf emptied, and every tired mortar joint we pass written down.

Open it →

Chimney Inspection

A Level 1 visual check or a Level 2 video scan, read by people who repair brick for a living.

Open it →

Chimney Repair

Split crowns, perished joints, cracked flue tile and loose brick put right with materials that suit how the stack was built.

Open it →

Fireplace Inspection

The firebox, hearth, damper and surround examined from inside the room, with the firebrick joints read the way a mason reads them.

Open it →

Fireplace Repair

Burned-out firebrick relaid in refractory cement, a cracked hearth slab replaced and a rough smoke chamber parged smooth.

Open it →

Chimney Level 2 Inspection

A $400 visit with a video scan of the flue, roof and attic passage, for a sale, a quake or a chimney fire.

Open it →

Chimney Cap Installation

A metal top measured on the roof and anchored to the tile or crown, installed, and quoted after we measure. Cap size, metal and flue count shape the price.

Open it →

Chimney Flashing Repair

New step pieces along the roofline and a counter layer tucked into a freshly cut mortar joint in the brick.

Open it →

Chimney Masonry Repair

Tuckpointing and spalled brick replaced, with joints struck to the old profile in a mortar chosen for the brick.

Open it →

Chimney Rebuilds

A stack too loose or leaning to repoint, taken down to firm courses and laid back up with steel, a crown and cap.

Open it →

Fireplace Cleaning

Firebox, grate, ash bed and smoke shelf cleaned down to the brick, so the firebrick and its joints can be read.

Open it →

Gas Fireplace Cleaning

Burner ports, pilot hood, ceramic logs and glass cleaned, then the flame watched and the outside vent cleared.

Open it →

Gas Fireplace Repair

Pilots that drop out, burners that never catch and dead remotes traced one part at a time before anything is ordered.

Open it →

Fireplace Inserts

A sealed heater fitted to the brick opening you already have, with a liner to the crown and a face that suits the surround.

Open it →

Pellet Stove Repair

A pellet heater cleaned through its ash passages, then its igniter, motors and sensors tested until the fault shows.

Open it →

Wood Stove Repair

Door rope, glass, liner bricks and baffles renewed so the stove closes tight and burns as slowly as it was built to.

Open it →

Gas Logs

A vented log set placed in a masonry firebox that has been looked over first, with gas brought to the hearth.

Open it →

Chimney Seismic Retrofit

Unreinforced brick above the roofline assessed, then braced to the framing, strapped, or replaced with a lighter top.

Open it →

Chimney Crown Repair

A cracked or flat mortar top replaced with a cast crown that overhangs the brick and leaves the flue tile room to move.

Open it →

Dryer Vent Cleaning

Lint cleared from the duct between the dryer and the outside hood, and the hood flap and run checked for crushing.

Open it →

Chimney Liner Installation

A stainless liner lowered into a cracked clay flue or an unlined brick stack, sized for the appliance below it.

Open it →

Chimney Leak Repair

Water traced to its real way in, whether a split crown, open joints or tired flashing, then fixed: $575 to $3,450.

Open it →

Chimney Waterproofing

A siloxane repellent brushed onto brick that has already been repointed and capped, so the face sheds rain.

Open it →

Chimney Damper Repair

A rusted, warped or stuck throat damper freed, reset or replaced, or swapped for a lid-style unit on top of the flue.

Open it →

Chimney Chase Cover

A stainless top cut to the measured size of a framed chase, creased so water runs off it rather than sitting.